ABB
ABB Advant Controller PXAH401 3BSE017235R1 Submodule Carriers
Manufacturer: ABB
Product No.: PXAH401 3BSE017235R1
Product Type: Configuration and Logic Modules
Product Origin: USA
Payment:T/T, Western Union
Weight: 110g
Shipping port: Xiamen
Warranty: 12 months
The ABB PXAH401 3BSE017235R1 serves as the primary PXAH401 Submodule Carrier utilized to execute physical slot routing and interface connection extension across Advant Controller 400 system platforms.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | PXAH401 3BSE017235R1 |
| Brand | ABB |
| Origin | Sweden |
| Weight | 0.48 kg |
| Dimensions | 234 mm x 24 mm x 170 mm |
| Operating Temp | 0 to 55 deg C |
| Power Consumption | 1.5 W |
| Backplane Slots | Accommodation for communication and memory submodules |
| Connection Protocol | MasterBus / Local extension bus |
Profinet / EtherNet/IP Deterministic Networks and I/O Density Scaling
The module architecture routes electronic pathways from internal processing units to dedicated terminal matrices, establishing deterministic communication velocity lines across linked backplane bus paths. It accommodates network adapters to interface directly with Profinet / EtherNet/IP deterministic networks, ensuring data block transmission accuracy without software latency while optimizing I/O density scaling inside control enclosures. The baseline tracing handles raw high-frequency hardware synchronization routines while preserving direct firmware flash compatibility with upstream control modules.
Frequently Asked Questions
Q: Is online hot-swap insertion supported for submodules mounted onto this carrier board?
A: No. The master unit subrack must be completely powered down before plugging or removing any submodules from the baseboard to avoid data line shorts or unintended processor reset cycles.
Q: How does the unit manage backplane current distribution across installed submodules?
A: The carrier routes the localized 5 VDC and 24 VDC rails via heavy-duty multi-layer printed circuit board traces, balancing the impedance matching requirements to limit voltage drops under full operational load.
Field Installation Guidelines
- Discharge all static electricity from tools and clothing before sliding the assembly into the designated master subrack frame slot.
- Ensure all locking tabs on both the carrier module and its attached submodules are fully seated and mechanically engaged.
- Route all localized field link cables within partitioned wiring troughs to keep inductive power noise away from low-voltage bus interfaces.
- Connect the chassis backplane earth directly to the local instrumentation clean ground terminal bus with a short copper wire lead.
Return policy
We aim to provide reliable products and a smooth purchasing experience. If there is a problem with your order, please contact us and we will assist according to our Refund Policy.
Shipping
We provide international shipping options to meet different delivery requirements. Please review details regarding methods and timelines in our Shipping Policy.
Warranty
We provide a 12-month warranty for all products, subject to normal use and proper installation.
You may also like
Product Guide
Mitigating SCADA Performance Drops During Shift Transitions
Mitigating SCADA Performance Drops During Shift Transitions
Optimizing SCADA Performance: Why Remote Clients Experience Lag
Optimizing SCADA Performance: Why Remote Clients Experience Lag