Honeywell
Honeywell 2MLR-M02P-CC 2-Slot Main CPU Base for MasterLogic-200R, 24V DC Backplane
Manufacturer: Honeywell
Product No.: 2MLR-M02P-CC
Product Type: Main CPU Base
Product Origin: USA
Payment:T/T, Western Union
Weight: 1600g
Shipping port: Xiamen
Warranty: 12 months
Product Overview
The Honeywell 2MLR-M02P-CC is a 2-slot main CPU base engineered for the MasterLogic-200R (ML200R) redundant PLC platform. This compact baseplate provides mechanical mounting, backplane communication, and 24 VDC power distribution for up to two I/O or communication modules. With 1500 VAC slot-to-slot isolation and a rugged industrial frame, it delivers reliable modularity for space-constrained automation deployments.
Key Specifications
- Slot Capacity: 2 modules (I/O or communication)
- System Compatibility: MasterLogic-200R PLC
- Backplane Current: 8 A max (shared)
- Power Distribution: 24 VDC
- Isolation: 1500 VAC (slot-to-slot)
- Connector Type: High-density 48-pin
- Current Consumption: 211 mA
- Dimensions (W × H × D): 238 × 98 × 19 mm
- Weight: 0.33 kg
- Operating Temperature: -20°C to +60°C
- Storage Temperature: -40°C to +85°C
- Humidity: 5% to 95% RH, non-condensing
- Vibration Resistance: 5–150 Hz, 1 G
Features & Benefits
- Compact 2-Slot Design: Ideal for small-footprint control cabinets where only a CPU and one expansion or communication module are required.
- High Isolation Rating: 1500 VAC slot-to-slot isolation protects against ground loops and electrical transients.
- Shared 8 A Backplane: Delivers ample current for high-density I/O or power-hungry communication modules.
- Industrial Durability: Operates across -20°C to +60°C with 1 G vibration resistance for harsh factory floor conditions.
- Redundancy Platform Ready: Designed specifically for ML200R redundant architectures, enabling hot-standby CPU configurations.
FAQ
Q: Is the 2MLR-M02P-CC compatible with standard MasterLogic-200 (non-redundant) CPUs?
A: The 2MLR-M02P-CC is optimized for MasterLogic-200R redundant systems. For standard MasterLogic-200 deployments, use the 2MLB-M04A or 2MLB-M06A main base series.
Q: What modules can be installed in the two slots?
A: Any MLR-series I/O, communication, or expansion driver modules designed for the MasterLogic-200R platform are supported.
Q: Can I expand beyond two slots using this base?
A: Yes. Install an expansion driver module (such as 2MLR-DBST for twisted pair or 2MLR-DBSF for fiber optic) in one slot to connect remote expansion bases.
Installation Guide
- Mount the base securely inside the control cabinet using panel-mount or DIN-rail brackets.
- Connect 24 VDC power to the base power terminals, observing correct polarity.
- Install the redundant CPU module (2MLR-CPUH/T or 2MLR-CPUH/F) into the designated CPU slot.
- Install up to two I/O or communication modules into the remaining slots, pressing firmly until the retention latches engage.
- Verify all module LED indicators show normal status before energizing the control strategy.
Selection Tips
- Slot Count: Choose the 2MLR-M02P-CC for minimal I/O count (2 slots). For larger local I/O requirements, consider the 2MLR-M06P-CC (6-slot) main base.
- Redundancy Planning: Pair with 2MLR-CPUH/T (twisted-pair network) or 2MLR-CPUH/F (fiber-optic network) redundant CPUs for high-availability architectures.
- Power Budget: Ensure your external 24 VDC supply can deliver the base consumption (211 mA) plus the total current draw of all installed modules.
- Cabinet Space: At 238 mm wide, verify horizontal rail or panel space in compact enclosures before ordering.
Return policy
We aim to provide reliable products and a smooth purchasing experience. If there is a problem with your order, please contact us and we will assist according to our Refund Policy.
Shipping
We provide international shipping options to meet different delivery requirements. Please review details regarding methods and timelines in our Shipping Policy.
Warranty
We provide a 12-month warranty for all products, subject to normal use and proper installation.
You may also like
Product Guide
Mitigating SCADA Performance Drops During Shift Transitions
Mitigating SCADA Performance Drops During Shift Transitions
Optimizing SCADA Performance: Why Remote Clients Experience Lag
Optimizing SCADA Performance: Why Remote Clients Experience Lag